Blackhills Windfarm
Blackhills, Scotland, UKPlanned commissioning date | October 2030 |
---|---|
Total capacity | 43.2 MW (Wind) 20 MW (BESS) |
Das Projekt
Koehler Renewable Energy is currently developing the Blackhills Wind Farm project in Scotland. The plan is for the wind farm to have up to six wind turbines with a tip height of up to 200m, as well as a 20MW battery energy storage system (BESS).
The project will be located seven kilometers southeast of Elgin, Moray, Scotland, with the site on the eastern side of Brown Muir Hill.
To learn more about the Blackhills Wind Farm, please visit: https://koehlerrenewableenergy.uk
Permit approval still pending.
Anlagendaten
Planned commissioning date | October 2030 |
---|---|
Number of wind turbines | 6 |
Turbine model | Vestas V162 - 7.2 MW |
Total capacity | 43.2 MW (Wind) 20 MW (BESS) |
Power generated | 189,499 MWHr/year |

Kontakt
Blackhills Windfarm
Koehler Renewable Energy UK Ltd.
Suite 17
Victoria Court
5 West Victoria Dock Road
Dundee DD1 3JT
Scotland, UK